In March. 2008 the consertium which formed by OIEC, ODCC, EIED and Dextron Group Companies signed the Contract for EPC Project( comprising basic design, detail design, procurement and supply of materials, construction , pre-commissioning and provide assistance in commissioning) of Utility & Offsite of Hormuz Extra Heavy Oil Refinery with Hormuz Oil refining Co.
In the consortium internal side agreement The EIED’s Scope(Basic,Detail and procurement Services) consisting units is as follows:
|
1. Offsite Unit (Including Tank age, Blending and Product Transfer)
|
|
2. Steam and Power Generation Unit (Including Steam and Power Generation and Distribution, Condensate
|
|
Recovery System, Main Power Feeders, all Substation Equipments in utility area)
|
|
3. Fuel Oil and Fuel Gas Unit (Including Distribution)
|
|
4. LPG Tankage, blending and Loading Facilities.
|
|
5. Ancillary Facilities (Including all Ancillary Refinery Buildings, Infrastructures and Roads)
|
|
6. Interconnections
|