NO.
|
Name & Location of plant
|
Plant capacity
|
Start Date
|
Completion Date
|
Owner
|
Scope of work
|
|
1
|
Bandar Abbas Refinery, Bandar Abbas
|
Two Separate Trains, each 116,000 Bbl/D Vacuum Unit Capacity 63,000 BBL/D
|
1988
|
1997
|
Snamprogetti Italy
|
Basic & Detailed Design of Vacuum & Atmospheric Distillation Unit
|
|
2
|
Iranian Petroleum Standards (IPS)
|
Preparation of Standards in all Related Fields For the Ministry of Petroleum
|
1988
|
1996
|
NIOC
|
398 Standards With More Than 20,000 Pages in 12 Work Disciplines
|
|
3
|
L.A.B Complex, Esfahan
|
12,000 BPD
|
1988
|
1991
|
Iran Chemical Industries Investment Company
|
Basic & Detailed Engineering Design
|
|
4
|
Arak Refinery, Arak
|
21,600 BPD DCS Control
|
1990
|
1991
|
TPL, Italy
|
Detailed Design NHT/CCR Platformer Units
|
|
5
|
Esfahan Petrochemical Complex, Esfahan
|
7,500 BPD
|
1990
|
1991
|
Esfahan Petrochemical Complex
|
Basic & Detailed Design of Feed Facilities
|
|
6
|
Khorasan Petrochemical Complex, Bojnurd, Khorasan
|
-
|
1990
|
1991
|
Khorasan Petrochemical Complex
|
Consultancy Services for the Entire Complex
|
|
7
|
Ninth (Condensate) Refinery, Bandar Taheri
|
70,000 bbl/d, DCS Control, The Refinery Includes DEA Gas Treater
|
1991
|
1993
|
NIOC
|
Complete Basic Design of Condensate Refinery
|
|
8
|
Pakistan/Iran Pak Refinery
|
-
|
1992
|
1993
|
ABB Lummus Crest (Germany)
|
Feasibility Studies
|
|
9
|
Tehran Planning & Information System Design
|
-
|
1992
|
1994
|
Hormozgan Cement Co
|
Design and Development of Project Planning and Controlling System
|
|
10
|
Khoramabad Nyl-Iran Tire Production Co Khoramabad
|
-
|
1992
|
1993
|
Bank of Industry and Mines of Iran
|
Optimization Study for the Use of Nylon Fibbers in the Tire Industry
|
|
11
|
Esfahan Polyacryle Complex, Esfahan
|
Air Pollution Control & Recovery System Optimization of Monomer in Polyacryle Co
|
1993
|
1998
|
Iran Polyacryle Company
|
Basic and Detailed Engineering
|
|
12
|
Ahwaz Pipeline Facilities Pump Station for Mile 40 Ahwaz & Tabriz Pipeline & Pump Station for Tabriz-Sarab-Ardabil Pipeline
|
Technical Service (200,000 Bbl/D) & Technical Service (35, 000 Bbl/D)
|
1993
|
1995
|
NIOC
|
Basic and Detail Design Engineering & Procurement Services
|
|
13
|
Sarkhun Pump Station
|
12,000, Bbl/D
|
1993
|
1998
|
NIGC
|
Basic and Detailed Design Engineering & Technical Assistance
|
|
14
|
Esfahan Pipeline River Crossing Bridges Karoon, Jarahi, Zayandehrood River
|
-
|
1994
|
1997
|
NIOC
|
Design Of Bridges & River Crossing (Basic & Detailed Design)
|
|
15
|
Aromatic Unit, Bandar Imam Petrochemical Company, Bandar Imam
|
-
|
1994
|
1998
|
BPC
|
Site Activities, Supervision, Technical Services, Field Engineering & Engineering Backups
|
|
16
|
Furfural Unit, Tehran Pars Oil Refinery, Tehran
|
-
|
1994
|
1996
|
Pars Oil Company
|
Contribution in Detailed Design (Renovation & Capacity Increase)
|
|
17
|
Tehran Refinery, Tehran
|
Modernisation of Control Systems
|
1995-1
|
1995-12
|
Tehran Refinery NIOC
|
Basic Design & Optimization Study
|
|
18
|
South Pars Gas Field Development
|
-
|
1995
|
1997
|
PEDEC
|
Conceptual Study & Basic Design
|
|
19
|
Pakistan Iran- Pak Refinery
|
-
|
1995
|
1996
|
NIOC- PERAK
|
Engineering, Preparation of Tender Document
|
|
20
|
NGL 1200 &1300 Plants, Gachsaran Bibi Hakimeh
|
-
|
1995-1
|
1995-12
|
NIOC- Onshore
|
Preliminary Engineering Study
|
|
21
|
Arak Lube Oil Arak
|
-
|
1995-1
|
1995-12
|
Bonyad Mostazafan
|
Feasibility Study
|
|
22
|
Dorood Oil Field Development in the Persian Gulf
|
-
|
1995
|
1996
|
NIOC- Offshore
|
Engineering & Tech. Support
|
|
23
|
1.33 Million Barrel Crude Oil Storage Tank, Kharg Island
|
1.33 Million Barrel Crude Oil
|
1995
|
1996
|
NIOC- Offshore
|
Engineering
|
|
24
|
Foundation of Drilling Rigs, Kharg Island
|
-
|
1995
|
1996
|
NIOC- Offshore
|
Engineering & Tech. Support
|
|
25
|
Master Development Plan for Kharg, Siri, Lavan Islands, & Bahregan Oil Centre, the Persian Gulf
|
-
|
1995
|
1996
|
NIOC- offshore
|
Engineering
|
|
26
|
Norooz Oil Field Living Quarters, the Persian Gulf
|
-
|
1995
|
1996
|
NIOC- offshore
|
Basic Engineering
|
|
27
|
ISO Standards Translation
|
-
|
1995
|
1996
|
Plan & Budget Organization
|
Translation of 137 ISO Standards in to Farsi
|
|
28
|
Iran Gas Europe Altern. A LNG Altern. B Pipeline, Iran- Europe
|
A:10 LNG Trains each 2.5 million t/y B: 35 bncm/ySales Gas
|
1995
|
1996
|
Linde
|
Feasibility Study
|
|
29
|
Tabriz Petrochemical Complex, Tabriz
|
HVAC Engineering
|
1995
|
1998
|
Tabriz Petrochemical Complex
|
Detailed Design and Procurement Services
|
|
30
|
Sarkhun II Gas Refinery Gas Sweetening Unit 1000
|
-
|
1995
|
1998
|
NIGC
|
Basic & Detailed Design Technical Assistance
|
|
31
|
Tehran Refinery Waste Water Treatment
|
-
|
1995
|
1998
|
Tehran Refinery
|
Optimization Study
|
|
32
|
Gachsaran Gas Treating and Injection, Gachsaran
|
-
|
1995
|
1998
|
NIOC
|
Basic Design Review, Detailed Design, Procurement Services & Technical Support
|
|
33
|
NGL-600
|
-
|
1996
|
1998
|
DICE
|
Supervision of Plant Installation
|
|
34
|
Khangiran Gas Treating Plant Phase II, Khangiran
|
Two GTU One SRU & Utility Expansion
|
1996
|
1999
|
NIGC
|
Basic Design Review, Detailed Design, Procurement Services & Technical Support
|
|
35
|
Norooz Oil Field Renovation the Persian Gulf
|
Offshore & Onshore 90,000 BPD
|
1997
|
1998
|
NIOC Offshore
|
Extended Basic Design
|
|
36
|
South Pars Gas Field Development Phase 1, Stage 2
|
-
|
1997
|
1998
|
PEDEC
|
Detailed Design (Terminated At 50% Progress)
|
|
37
|
Norooz Oil Field Master Development Plan
|
-
|
-
|
-
|
|
Pre- Basic Design, for the total Surface Facilities
|
|
38
|
S3 & S6 Gas Compressor Stations
|
-
|
-
|
-
|
|
Basic Design for Civil & Structural Discipline and Complete Detail Engineering
|
|
39
|
Noor Abad Gas Compressor Station
|
-
|
-
|
-
|
|
Complete Process Basic Design and Detail Design
|
|
40
|
Sixth Olefin Plant Amir Kabir Petrochemical Complex
|
-
|
-
|
-
|
|
Detailed Engineering , Procurement & SSC
|
|
41
|
Turkmenbashi Refinery Gasoline unit
|
-
|
-
|
-
|
|
Detail Design, Procurement Services
|
|
42
|
NGL 1300
|
-
|
-
|
-
|
|
Basic Design, Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
|
|
43
|
NGL 1200
|
-
|
-
|
-
|
|
Review of Basic Design, Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
|
|
44
|
Petrochemical Storage Facilities,Bandar Imam
|
-
|
-
|
-
|
|
Complete Basic Design, Detail Engineering and Procurement Services, FES
|
|
45
|
4th Aromatic, Bandar Assaluyeh
|
-
|
-
|
-
|
|
MC, Partnership with FW
|
|
46
|
Seventh Olefin Plant Maroun Petrochemical Complex, Bandar Imam
|
-
|
-
|
-
|
|
Detailed Engineering, Procurement & SSC
|
|
47
|
Acetic Acid Plant, Bandar Imam
|
-
|
-
|
-
|
|
EP & FES
|
|
48
|
Consulting Services To “MATN”
|
-
|
-
|
-
|
|
Consulting Engineering Services
|
|
49
|
9th Olefin Complex Bandar Assaluyeh
|
-
|
-
|
-
|
|
SSC (Site Supervision Contract), Partnership with Engineering India LTD. (EIL)
|
|
50
|
Six Gas Compressor Stations
|
-
|
-
|
-
|
|
E & SSC (Site Supervision Contract)
|
|
51
|
Four Gas Compressor Stations - North West
|
-
|
-
|
-
|
|
SSC (Site Supervision Contract)
|
|
52
|
Darquain Oil Field Development Phase II
|
-
|
-
|
-
|
|
MC & SSC
|
|
53
|
South Pars Gas Field Development Project – Phases 9 & 10, Bandar Assaluyeh
|
-
|
-
|
-
|
|
Basic Design Review, Procurement Engineering Services, Field Engineering Services
|
|
54
|
Khuzestan Extra Heavy Crude Oil Refinery
|
-
|
-
|
-
|
|
Basic Design
|
|
55
|
Day & Sepid Zakhur Gas Field Development
|
-
|
-
|
-
|
|
MC & SSC
|
|
56
|
Bid Boland II Gas Processing & Pipiline
|
-
|
-
|
-
|
|
MC & SSC
|
|
57
|
Sirri Island Gas Gathering & NGL Recovery
|
50 MMSCFD Natural Gas, 6,900 BPD Propane, 3,750 BPD Butane, 3,180 BPD Condensate
|
2004
|
2007 (engineering)
|
IOOC/OIEC
|
Detail Design, Procurement Engineering Services, Field Engineering Services
|
|
58
|
Hormoz Heavy Oil Refinery
|
300,000 BPSD
|
2008
|
Hold by Owner
|
NIOEC
|
EPC, Part of Utility & Offsite Unitesn (hold by owner)
|
|
59
|
Tehran Refinery Product Quality Upgrading
|
80,000 BPD De-sulfurization
|
2007
|
2012
|
NIOEC
|
MC & SSC
|
|
60
|
Mahshahr Jetty No.2
|
-
|
2008
|
2012
|
PETZONE
|
MC & SSC
|