Current Projects

NO. Name & Location of plant Plant capacity Start Date Completion Date Owner Scope of work
1 TGTU of South Pars Gas Field Development– Phases 2 & 3, Assaluyeh 2 x 130 Ton/day Liquid sulphur from acid gas TGTU 95% to 99.7% efficiency 2012 POGC EPC
2 Gas sweetening Unit & Ethane Recovery 324 MMSCFD 2012 - Bushehr Petrochemical Company Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
3 NGL 3100 270 MMSCFD 2013 - OIEC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
4 West Karoon Oil Fields Early Production Units (Arvandan) 165,000 BPD 2011 AOGC EPC
5 Custody Transfer Metering & Centralised Monitoring 70 points in whole country 2012 Ministry of Petroleum MC & SSC + Basic Design of part of metering points
6 South Pars Gas Field Development Project – Phases 20 & 21, Assaluyeh 2 x 1,000 MMSCFD Natural Gas, 2 x 40,000 bbls/D Condensate 2010 - POGC/OIEC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
7 South Pars Gas Field Development Project – Phases 17 & 18, Assaluyeh 2 x 1,000 MMSCFD Natural Gas, 2 x 40,000 bbls/D Condensate 2010 - POGC/OIEC Detail Design, Procurement Engineering Services, Field Engineering Services
8 Ilam HDPE Plant 300,000 t/y HDPE 2004 ILPC EPCC, Partnership with MES (Japan)
9 Tabriz Refinery Gasoline Production 18,000 BPSD 2007 Tabriz Oil Refinery Co. EPCC, Partnership with SEI(China)
10 North-Northeast Six Compressor Stations 58, 57, 54, 52, 30, 30 MMSCMD 2007 IGEDC SSC
11 200 Turbo Compressors 100 TC's by OTC, 100 TC's by MAPNA 2010 NISOC MC & SSC
12 Bid Boland-II Refinery feed Supply 1,800 MFCPD 2011 NISOC MC & SSC
13 Mahshahr Oil Product Terminal Revamp 6 jetty/34 Loading Arm, 12,000,000 Barrel Fuel Oil Storage Tanks, 500,000 Barrel Gasoline Storag Tanks 2012 NIOEC MC & SSC